Status: Under review. Filed with the municipality and being reviewed.

Development application OZS-2024-0061, B-2024-0007

0 Coleraine Dr

0 Coleraine Dr is the site of 3 applications on the City of Brampton's record (plan of subdivision, consent (land division), pre-application consultation) in Ward 10. It is under review and has not been decided.

Last checked November 27, 2026City of BramptonHow we know
Publisher
City of Brampton
Source dataset
Planning applications (Brampton GeoHub layers)
Retrieved
November 27, 2026
Licence
Creative Commons Attribution 4.0 International (CC BY 4.0) Terms
From the source
the project and application names · file numbers · status · dates where recorded · the description of the proposal
Derived by BramptonIQ
the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby
BramptonIQ’s words
the summary sentence
Kept current
Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.

Proposed, in the record's words: “The scope of this development proposal encompasses the development of the subject site to accommodate three (3) parcels, each featuring industrial buildings. These buildings are sized at 35,427.29 m2 (381,336.15sqft)…”. Latest dated step on the record: application received, October 25, 2024. Files OZS-2024-0061, B-2024-0007.

As of November 27, 2026 · City of Brampton

Data currency. Read from the City of Brampton source on November 27, 2026. The source was last edited November 27, 2026. Only 7,923 of 9,373 records carry a date; the newest is November 16, 2026. Planning applications (Brampton GeoHub layers)

At a glance
Stage
Under review
Status on the record
In Review-Public Mtg Complete; Final and Binding; Closed
Address
0 Coleraine Dr
Ward
10
File numbers
OZS-2024-0061, B-2024-0007, PRE-2023-0035
First application received
March 8, 2023
Aerial view of 0 Coleraine Dr, Brampton
Imagery: Esri, Maxar, Earthstar Geographics

What is proposed

The scope of this development proposal encompasses the development of the subject site to accommodate three (3) parcels, each featuring industrial buildings. These buildings are sized at 35,427.29 m2 (381,336.15sqft), 8,398.74 m2 (90,403.28 sqft), and 5,362.79 m2 (57,725 sqft) respectively, with an additional proposed 1-hectare Stormwater Management Pond.

The purpose of the application is to request consent of the Committee of Adjustment to grant to grant a severance of a parcel of land currently having a total area of approximately 20.39 hectares (50.41 acres) together with an access easement. The proposed severed lot will have no frontage and an area of approximately 3.75 hectares (9.27 acres). The access easement will have an approximate width of 8m and will be in favor of the City of Brampton/the Region of Peel. This application is intended to aid the adjacent landowners in dedicating the future Stormwater Management Pond lands to the City of Brampton to fulfil their Draft Plan of Subdivision registration obligations (City file: C11E15.002).

To propose the development of three (3) parcels containing three (3) industrial sized buildings at 35,427.29 m2 (381,336.15 sqft), 8,398.74 m2 (90,403.28 sqft), and 5,362.79 m2 (57,725 sqft) with a proposed 1 hectare SWP. A preconsultation meeting was held in April 2019 and October 2020 for similar industrial building layouts. A decision to move forward with the application was not met both times. We would now like to actively submit this application and soon after submit for Site Plan, ZBLA and OPA.

The City of Brampton’s description of the applications, as published.


What has happened

Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.

  1. March 8, 2023

    Application received · Pre-application consultation PRE-2023-0035

  2. May 2, 2024

    Application received · Consent (land division) B-2024-0007

  3. October 25, 2024

    Application received · Plan of subdivision OZS-2024-0061

  4. The record shows nothing dated after October 25, 2024; the next recorded step appears here when the municipality enters it.


The 3 applications

The source links these records to one another (the same planning file or the same site), so they are shown as one project. Each is listed as the municipality records it.

  1. Plan of subdivisionOZS-2024-0061

    Type
    Plan of subdivision (Draft Plan of Subdivision | Zoning By Law Amendment)
    Status on the record
    In Review-Public Mtg Complete
    Received
    October 25, 2024
  2. Consent (land division)B-2024-0007

    Type
    Consent (land division) (Consent to Sever)
    Status on the record
    Final and Binding
    Received
    May 2, 2024
  3. Pre-application consultationPRE-2023-0035

    Type
    Pre-application consultation (Pre-consultation)
    Status on the record
    Closed
    Received
    March 8, 2023

Sources

Contains information licensed under CC BY 4.0 from the City of Brampton Creative Commons Attribution 4.0 International (CC BY 4.0). Figures are the municipality’s records at the date checked; a later submission can change them.