Closures on the City's map and in official notices when this page was checked, with their posted end dates.
When does the Clockwork Drive closure end?
Clockwork Drive is closed between Chinguacousy Road and Edenbrook Hill Drive from November 23 to December 11, 2026, for development road works, with detour signs posted.
Source: City of Brampton, Road Closures
Why is John Street closed downtown?
A section of John Street, from 100 John Street to the end of the street, is closed from October 15, 2026 to April 1, 2027 for watermain diversion work that is part of the Riverwalk downtown Brampton flood protection project.
Source: City of Brampton, Road Closures
Why is Clarkway Drive closed?
Peel Region closed Clarkway Drive south of Countryside Drive to through traffic from July 20, 2026 to install a new watermain and sanitary sewers along Clarkway Drive and Countryside Drive. The Region expects to finish in spring 2027, and the City's map lists the closure to May 31, 2027. Local traffic can reach Clarkway Drive from Castlemore Road.
The contractor may work weekends and overnight (7 p.m. to 7 a.m.), and the Region expects temporary water shut-offs, normally with 48 hours' notice.
Source: Peel Region, Project 23-2272 - August 4, 2026 update
Why is Heart Lake Road South closed near Glidden Road?
Heart Lake Road South is closed to through traffic from Glidden Road to 341 Heart Lake Road South while Peel Region upgrades the Beckett Sproule water pumping station and reservoir at 321 Heart Lake Road South. The closure began around November 10, 2025 and is expected to last until summer 2027, with a marked detour and a turning circle near 341 Heart Lake Road South.
Source: City of Brampton, Long Term Road Closure: Heart Lake Road South from Glidden Ave to 341 Heart Lake Road South
Is Nelson Street closed downtown?
Yes. Nelson Street East between Main Street and Union Street is closed for condominium construction and is expected to stay closed until November 2028. A detour gives vehicle access to businesses on Nelson Street from Union Street, and pedestrian access is maintained.
Source: City of Brampton, Road Closures
Is Queen Street West down to one lane downtown?
Yes, for now. Under Phase 4C of the City's downtown streetscape project, which began September 21, 2026 and is scheduled to end in December 2026, Queen Street West is reduced to a single eastbound lane between George Street North and Park Street, with work from 7 a.m. to 7 p.m. Monday to Friday.
Source: City of Brampton, Downtown Brampton Streetscape Project: Phase 4C road closure notice