Skip to content

Guide

The Hazel McCallion Line LRT in Brampton

Where the Hazel McCallion Line light rail will stop in Brampton, when it might open, how often trains will run, what the construction means on Hurontario Street, and the plan to tunnel it into downtown Brampton.

Summary

The Hazel McCallion Line is an 18-km light rail line under construction on Hurontario Street from Port Credit GO to the Brampton Gateway Terminal at Steeles Avenue, with three stops in Brampton: Ray Lawson, County Court and Brampton Gateway Terminal. Metrolinx has not announced an opening date. A planned four-kilometre tunnel would extend it to downtown Brampton, and that extension is at the planning and design stage.

Last verified

Administered by Metrolinx is building the Hazel McCallion Line and planning its downtown Brampton extension; the City of Brampton studied the extension route. Every answer below was checked against its source on November 27, 2026; the source is linked under each one.


The line in Brampton

Where will the LRT stop in Brampton?

The City of Brampton lists three Hazel McCallion Line stops in Brampton: Ray Lawson, County Court and Brampton Gateway Terminal, the northern end of the line at Steeles Avenue. The line's operations, maintenance and storage facility is also in Brampton, on Kennedy Road south of Highway 407. In all, the 18-km line has 19 stops between Brampton Gateway Terminal and Port Credit GO.

Source: City of Brampton, Hazel McCallion Line

When will the Hazel McCallion Line open?

Metrolinx has not announced an opening date. Its project page describes what the line will do once in service, and its February 12, 2026 rapid transit update said the line was under construction, with track work done at most intersections and along the guideway and stops taking shape with platform bases and canopies. Metrolinx expects 32 million riders by 2031.

Source: Metrolinx, CPG (Rapid Transit) State of the Network

How often will the LRT run?

Metrolinx says trains will run every 7.5 minutes at peak periods and every 10 to 12 minutes off-peak, in their own dedicated lanes. The 28 vehicles are Alstom Citadis Spirit light rail vehicles assembled at Alstom's Brampton plant; each is 50 metres long, carries up to 292 passengers, has low-floor boarding and four accessible spaces per compartment.

Source: Metrolinx, Hazel McCallion Line - Frequently Asked Questions


Construction on Hurontario Street


The downtown Brampton extension

Will the LRT be extended into downtown Brampton?

It is planned. In January 2025 the Ontario government announced it would extend the Hazel McCallion Line into downtown Brampton with a planned four-kilometre underground tunnel from the Brampton Gateway Terminal. Metrolinx says the Downtown Brampton Extension is at the planning and design stage, with environmental studies under the Transit and Rail Project Assessment Process and geotechnical investigations under way.

No construction start, opening date or cost for the extension has been published. Metrolinx says public engagement dates will be shared when confirmed.

Source: Metrolinx, Hazel McCallion Line Downtown Brampton Extension

Why is the Brampton extension a tunnel?

The City's LRT Extension Study compared ways to bring light rail along Main Street from Brampton Gateway Terminal to the downtown GO station, including the approved surface route, a Main-George one-way loop and a tunnel. After pre-planning, a surface option and a tunnel option were judged viable, the City completed draft 30 per cent designs and environmental reports for both, and Brampton City Council endorsed the tunnel.

Source: City of Brampton, LRT Extension Study

Who is paying for the Brampton LRT extension?

The Province advanced funding for planning both downtown extensions in March 2024 and announced the Brampton tunnel in January 2025. In March 2025 the federal government said it intends to support the Brampton extension through the Metro-Region Agreement stream of the Canada Public Transit Fund. Neither announcement, as the City reported them, gives a dollar figure for the extension.

Source: City of Brampton, City of Brampton welcomes federal funding support for the development of rapid transit tunnel

Sources

Every factual claim above traces to one of these documents.

  1. City of Brampton

    Hazel McCallion Line

    Retrieved November 27, 2026

  2. Metrolinx

    CPG (Rapid Transit) State of the Network

    Published February 12, 2026 · Retrieved November 27, 2026

  3. Metrolinx

    Hazel McCallion Line - Frequently Asked Questions

    Retrieved November 27, 2026

  4. Metrolinx

    Hazel McCallion Line

    Retrieved November 27, 2026

  5. Metrolinx

    Hazel McCallion Line: Brampton South

    Retrieved November 27, 2026

  6. Metrolinx

    Hazel McCallion Line Downtown Brampton Extension

    Retrieved November 27, 2026

  7. City of Brampton

    LRT Extension Study

    Retrieved November 27, 2026

  8. City of Brampton

    City of Brampton welcomes federal funding support for the development of rapid transit tunnel

    Published March 21, 2025 · Retrieved November 27, 2026