Skip to content
Status: Pre-application. Proposed to the municipality, but a complete application has not yet been received.

Development application PRE-2024-0075, OZS-2025-0038

0 Edvac Dr

0 Edvac Dr is the site of 4 applications on the City of Brampton's record (pre-application consultation, official plan amendment, consent (land division)) in Ward 8. It is at the pre-application stage: a complete application has not yet been received.

Last checked November 27, 2026City of BramptonHow we know
Publisher
City of Brampton
Source dataset
Planning applications (Brampton GeoHub layers)
Retrieved
November 27, 2026
Licence
Creative Commons Attribution 4.0 International (CC BY 4.0) Terms
From the source
the project and application names · file numbers · status · dates where recorded · the description of the proposal
Derived by BramptonIQ
the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby
BramptonIQ’s words
the summary sentence
Kept current
Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.

Proposed, in the record's words: “The proposed development for the subject property is for a townhouse condominium; 37 3-storey townhouse units with a combined total gross floor area of 7,221.8 m2. The proposed development is to be contained comfortably…”. Latest dated step on the record: application received, August 5, 2025. Files PRE-2024-0075, OZS-2025-0038.

As of November 27, 2026 · City of Brampton

Data currency. Read from the City of Brampton source on November 27, 2026. The source was last edited November 27, 2026. Only 7,923 of 9,373 records carry a date; the newest is November 16, 2026. Planning applications (Brampton GeoHub layers)

At a glance
Stage
Pre-application
Status on the record
Meeting Scheduled; In Review-Public Mtg Complete; Withdrawn; Closed
Address
0 Edvac Dr
Ward
8
File numbers
PRE-2024-0075, OZS-2025-0038, B-2024-0003, PRE-2022-0142
First application received
September 29, 2022
Aerial view of 0 Edvac Dr, Brampton
Imagery: Esri, Maxar, Earthstar Geographics

What is proposed

The proposed development for the subject property is for a townhouse condominium; 37 3-storey townhouse units with a combined total gross floor area of 7,221.8 m2. The proposed development is to be contained comfortably within the estimated developable area, leaving a 10-metre setback from the top of slope found on the north side of the subject property. The development also proposes a common amenity space and green space for townhouse residents which is located on the east of the subject property and accessed by a proposed pedestrian walkway.

The proposed development includes 41 three-storey townhouse units and 1 single detached dwelling, with a net density of 34 units per hectare. All buildings are located within the developable area, maintaining a 30-metre setback from the adjacent natural heritage feature and Redside Dace habitat. A central common amenity area is proposed adjacent to this feature. Access is provided via a right-in/right-out driveway onto Humberwest Parkway, leading to a central internal road. Each unit includes two parking spaces (garage and driveway), with 13 additional visitor spaces in two designated areas. The eastern portion of the site is proposed as Open Space for parkland dedication.

0

The proposed development includes a long-term care home, as well as a gas station. The long term care home is proposed to contain 77 residential beds and 57 parking spaces allocated for its use. The gas station consists of a 1-storey gas bar that is 233.85 square metres in area, with a roofed pump area, and 10 parking spaces associated with its use.

The City of Brampton’s description of the applications, as published.


What has happened

Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.

  1. September 29, 2022

    Application received · Pre-application consultation PRE-2022-0142

  2. February 16, 2024

    Application received · Consent (land division) B-2024-0003

  3. June 3, 2024

    Application received · Pre-application consultation PRE-2024-0075

  4. August 5, 2025

    Application received · Official plan amendment OZS-2025-0038

  5. The record shows nothing dated after August 5, 2025; the next recorded step appears here when the municipality enters it.


The 4 applications

The source links these records to one another (the same planning file or the same site), so they are shown as one project. Each is listed as the municipality records it.

  1. Pre-application consultationPRE-2024-0075

    Type
    Pre-application consultation (Pre-consultation)
    Status on the record
    Meeting Scheduled
    Received
    June 3, 2024
  2. Official plan amendmentOZS-2025-0038

    Type
    Official plan amendment (Official Plan Amendment | Zoning By Law Amendment)
    Status on the record
    In Review-Public Mtg Complete
    Received
    August 5, 2025
  3. Consent (land division)B-2024-0003

    Type
    Consent (land division) (Consent to Sever)
    Status on the record
    Withdrawn
    Received
    February 16, 2024
  4. Pre-application consultationPRE-2022-0142

    Type
    Pre-application consultation (Pre-consultation)
    Status on the record
    Closed
    Received
    September 29, 2022

Sources

Contains information licensed under CC BY 4.0 from the City of Brampton Creative Commons Attribution 4.0 International (CC BY 4.0). Figures are the municipality’s records at the date checked; a later submission can change them.