Development application OZS-2026-0003, OZS-2023-0027
1358 Queen St W
1358 Queen St W is the site of 4 applications on the City of Brampton's record (other application, official plan amendment, pre-application consultation, site plan) in Ward 5. It has been approved.
- Approved
- Closed Approved; Closed; Agreement Execution
- 1358 Queen St W
- 5
- OZS-2026-0003, OZS-2023-0027, PRE-2022-0058, SPA-2025-0104
- April 1, 2022
Proposed, in the record's words: “The proposed development is a new 4-storey, 80-bed youth shelter, to provide emergency accommodations for youth aged 16-24, with exterior and interior amenity areas for residents. Lifting of the Holding Provision”. Latest dated step on the record: application received, January 30, 2026. Files OZS-2026-0003, OZS-2023-0027.
- Approved
- Closed Approved; Closed; Agreement Execution
- 1358 Queen St W
- 5
- OZS-2026-0003, OZS-2023-0027, PRE-2022-0058, SPA-2025-0104
- April 1, 2022
What is proposed
The proposed development is a new 4-storey, 80-bed youth shelter, to provide emergency accommodations for youth aged 16-24, with exterior and interior amenity areas for residents. Lifting of the Holding Provision.
Proposed Youth Shelter with a maximum height of four storeys and 46 units (80 beds) at 1358 Queen Street West. A total of 19 parking spaces, two of which are barrier-free, will be located to the rear of the property behind the proposed building
Proposed Youth Shelter with a maximum height of four storeys and 40 units at 1358 Queen Street West. A total of 19 parking spaces, two of which are barrier-free, will be located to the rear of the property behind the proposed building.
The proposed development is a new 4-storey, 80-bed youth shelter designed to provide emergency accommodation for youth aged 16 to 24 within a safe, supportive, and trauma-informed environment. The project integrates a mix of private and communal spaces, including counselling and program rooms, lounges, a dining area, and a warming kitchen to support the daily needs and well-being of its residents. Additionally, staff facilities such as private offices, meeting rooms, and a lounge are provided to ensure effective service delivery. The residential character of the building is emphasized through thoughtful architectural design, particularly with the incorporation of pitched roofs to align with the surrounding low-rise residential context. The north/south rectangular building form and height were determined through feasibility and zoning analysis. The gabled roof facing Queen Street reduces the building’s visual mass and enhances its residential appeal, while the south and central pitched roofs accommodate mechanical spaces and central features like the atrium and stair. A flat rear roof, required for mechanical equipment, is partially screened by sloped roofs to maintain a cohesive aesthetic. Beds are primarily double-occupancy rooms (36 rooms across floors 2 to 4), with single-occupancy rooms on each floor, including eight pet-friendly rooms on the ground floor. All washrooms are individual and shared between small groups of suites, ensuring privacy and dignity. The site provides 23 surface parking spaces for staff and visitors and a secure, enclosed bike parking area for at least 16 bicycles. The total gross floor area (GFA) is 2,900m², located on a 2,720.1m² lot. Overall, the proposed development will provide critical housing infrastructure for vulnerable youth, thoughtfully integrated into the surrounding urban fabric with minimal visual disruption, while enhancing community support and safety.
What has happened
Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.
Application received · Pre-application consultation PRE-2022-0058
Application received · Official plan amendment OZS-2023-0027
Application received · Site plan SPA-2025-0104
Application received · Other application OZS-2026-0003
The record shows nothing dated after January 30, 2026; the next recorded step appears here when the municipality enters it.
The 4 applications
The source links these records to one another (the same planning file or the same site), so they are shown as one project. Each is listed as the municipality records it.
Other application
Official plan amendment
Pre-application consultation
Site plan
Sources
- Planning applications (Brampton GeoHub layers) — checked November 27, 2026