Skip to content
Status: Approved. The application has been approved. Building may not have started.

Development application T06W15.005, SP12-045.001

2675 Steeles Avenue West

2675 Steeles Avenue West is the site of 2 applications on the City of Brampton's record (zoning by-law amendment, site plan) in Ward 6. It has been approved.

Last checked November 27, 2026City of BramptonHow we know
Publisher
City of Brampton
Source dataset
Planning applications (Brampton GeoHub layers)
Retrieved
November 27, 2026
Licence
Creative Commons Attribution 4.0 International (CC BY 4.0) Terms
From the source
the project and application names · file numbers · status · dates where recorded · the description of the proposal
Derived by BramptonIQ
the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby
BramptonIQ’s words
the summary sentence
Kept current
Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.

Proposed, in the record's words: “Proposal to remove the remaining Holding (H) symbol in Churchill BC Phase 3 east of the TCPL adjacent to 2675 Steeles Avenue West (Block 2) and Blocks 3 and 5 in Registered Plan 43M-1936”. Latest dated step on the record: application received, August 17, 2018. Files T06W15.005, SP12-045.001.

As of November 27, 2026 · City of Brampton

Data currency. Read from the City of Brampton source on November 27, 2026. The source was last edited November 27, 2026. Only 7,923 of 9,373 records carry a date; the newest is November 16, 2026. Planning applications (Brampton GeoHub layers)

At a glance
Stage
Approved
Status on the record
Closed Approved; Site Plan Approved
Address
2675 Steeles Avenue West
Ward
6
File numbers
T06W15.005, SP12-045.001
First application received
October 24, 2016
Aerial view of 2675 Steeles Avenue West, Brampton
Imagery: Esri, Maxar, Earthstar Geographics

What is proposed

Proposal to remove the remaining Holding (H) symbol in Churchill BC Phase 3 east of the TCPL adjacent to 2675 Steeles Avenue West (Block 2) and Blocks 3 and 5 in Registered Plan 43M-1936

Proposal to construct a new 32,899.31 m2 addition to existing industrial building and replace existing LID area with cultec stormwater management system.

The City of Brampton’s description of the applications, as published.


What has happened

Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.

  1. October 24, 2016

    Application received · Zoning by-law amendment T06W15.005

  2. August 17, 2018

    Application received · Site plan SP12-045.001

  3. The record shows nothing dated after August 17, 2018; the next recorded step appears here when the municipality enters it.


The 2 applications

The source links these records to one another (the same planning file or the same site), so they are shown as one project. Each is listed as the municipality records it.

  1. Zoning by-law amendmentT06W15.005

    Type
    Zoning by-law amendment (Zoning By Law Amendment)
    Status on the record
    Closed Approved
    Received
    October 24, 2016
  2. Site planSP12-045.001

    Type
    Site plan (Site Plan Approval)
    Status on the record
    Site Plan Approved
    Received
    August 17, 2018

Sources

Contains information licensed under CC BY 4.0 from the City of Brampton Creative Commons Attribution 4.0 International (CC BY 4.0). Figures are the municipality’s records at the date checked; a later submission can change them.