Status: Pre-application. Proposed to the municipality, but a complete application has not yet been received.

Development application PRE-2021-0085, OZS-2026-0024

375 Clark Blvd

375 Clark Blvd is the site of 4 applications on the City of Brampton's record (pre-application consultation, official plan amendment) in Ward 7. It is at the pre-application stage: a complete application has not yet been received.

Last checked November 27, 2026City of BramptonHow we know
Publisher
City of Brampton
Source dataset
Planning applications (Brampton GeoHub layers)
Retrieved
November 27, 2026
Licence
Creative Commons Attribution 4.0 International (CC BY 4.0) Terms
From the source
the project and application names · file numbers · status · dates where recorded · the description of the proposal
Derived by BramptonIQ
the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby
BramptonIQ’s words
the summary sentence
Kept current
Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.

Proposed, in the record's words: “The proposed project is design of a one-storey modular daycare facility building with the area of 900 m² to accommodate 140 children including 4 toddler groups & 4 pre-school groups. The proposed new daycare facility to…”. Latest dated step on the record: application received, July 31, 2026. Files PRE-2021-0085, OZS-2026-0024.

As of November 27, 2026 · City of Brampton

Data currency. Read from the City of Brampton source on November 27, 2026. The source was last edited November 27, 2026. Only 7,923 of 9,373 records carry a date; the newest is November 16, 2026. Planning applications (Brampton GeoHub layers)

At a glance
Stage
Pre-application
Status on the record
Meeting Scheduled; In Review-Pre Public Meeting; Closed
Address
375 Clark Blvd
Ward
7
File numbers
PRE-2021-0085, OZS-2026-0024, PRE-2024-0092, PRE-2019-0018
First application received
September 5, 2019
Aerial view of 375 Clark Blvd, Brampton
Imagery: Esri, Maxar, Earthstar Geographics

What is proposed

The proposed project is design of a one-storey modular daycare facility building with the area of 900 m² to accommodate 140 children including 4 toddler groups & 4 pre-school groups. The proposed new daycare facility to be located in the vicinity of an existing church building within the central portion and along the west side of the Redeemer Church property located at 375 Clark Blvd. As part of the site design, the existing surface parking area will be re-arranged in alignment with the new proposed daycare facility & the existing building footprints.

The proposal contemplates the redevelopment of the Subject Property to accommodate a high-rise residential building and the relocation and reconstruction of the existing place of worship. The residential component consists of a 35-storey apartment building with a podium form and step-back levels, comprising approximately 416 residential units in a range of unit sizes and tenures, together with indoor and outdoor amenity areas for residents. The proposal also includes the relocation and redevelopment of the church facility on the southern portion of the site.

The proposed development comprises a 40-storey tower with a three-storey podium at the rear and 15 storeys podium along Bramalea Road. The proposed development envisions relocating the existing Church further south of the property and proposes associated parking at this location. Primary access is proposed at Clark Boulevard as a full move access and a right-in, right-out-only access is proposed at Bramalea Road. The proposed building incorporates a smooth transition to the west, where townhouse units exist, by utilizing step-backs to three storeys. The development envisions 472 parking spaces including 367 resident parking proposed and 102 visitor parking provided in 3 levels, and 3 staff parking.

Proposed OPA/ZBA for mixed-use development complex; consisting of residential, institutional and retail uses to be developed in phases.

The City of Brampton’s description of the applications, as published.


What has happened

Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.

  1. September 5, 2019

    Application received · Pre-application consultation PRE-2019-0018

  2. May 3, 2021

    Application received · Pre-application consultation PRE-2021-0085

  3. July 23, 2024

    Application received · Pre-application consultation PRE-2024-0092

  4. July 31, 2026

    Application received · Official plan amendment OZS-2026-0024

  5. The record shows nothing dated after July 31, 2026; the next recorded step appears here when the municipality enters it.


The 4 applications

The source links these records to one another (the same planning file or the same site), so they are shown as one project. Each is listed as the municipality records it.

  1. Pre-application consultationPRE-2021-0085

    Type
    Pre-application consultation (Pre-consultation)
    Status on the record
    Meeting Scheduled
    Received
    May 3, 2021
  2. Official plan amendmentOZS-2026-0024

    Type
    Official plan amendment (Official Plan Amendment | Zoning By Law Amendment)
    Status on the record
    In Review-Pre Public Meeting
    Received
    July 31, 2026
  3. Pre-application consultationPRE-2024-0092

    Type
    Pre-application consultation (Pre-consultation)
    Status on the record
    Closed
    Received
    July 23, 2024
  4. Pre-application consultationPRE-2019-0018

    Type
    Pre-application consultation (Pre-consultation)
    Status on the record
    Closed
    Received
    September 5, 2019

Sources

Contains information licensed under CC BY 4.0 from the City of Brampton Creative Commons Attribution 4.0 International (CC BY 4.0). Figures are the municipality’s records at the date checked; a later submission can change them.