Skip to content

Special service

Route 300 Heart Lake Employment Shuttle

Brampton Transit Route 300 Heart Lake Employment Shuttle is a special service serving 4 stops between Trinity Common Terminal Route 32/23 WB/ 300 Stop and Heart Lake Rd s/of Ecopark Cl. It runs on weekdays only, with 8 scheduled weekday trips, the first at 05:50 and the last at 23:30.

At a glance
Type
Special service
Stops served
4
Weekday trips
8
Saturday trips
No service
Sunday trips
No service
Dates in this schedule
73
Wheelchair-accessible trips
100%

Schedule in force September 7, 2026 to December 20, 2026. Figures are from the schedule Brampton Transit has published for September 7, 2026 to December 20, 2026. They describe the timetable, not today's real-time service. Data as of November 27, 2026.

Last checked November 27, 2026City of Brampton (Brampton Transit)How we know
Publisher
City of Brampton (Brampton Transit)
Source dataset
Brampton Transit schedule data (GTFS)
Official record
Brampton Transit: routes and schedules
Retrieved
November 27, 2026
Licence
Contains information licensed under CC BY 4.0 from the City of Brampton Terms
From the source
the route, its stops, trips and times · destination signs · the schedule's dates · the route's drawn path
Derived by BramptonIQ
trips per day and first and last departures on the reference dates · the main stopping pattern in each direction · routes sharing stops · the drawn path, simplified
BramptonIQ’s words
the summary sentence
Kept current
Rebuilt when the published feed changes. This schedule runs September 7, 2026 to December 20, 2026; the section is withdrawn once it ends.
Route 300 Heart Lake Employment Shuttle mapThe path of Route 300 Heart Lake Employment Shuttle as drawn in the published feed, with nearby GO stations.Route 300 Heart Lake Employment Shuttle
Route 300 Heart Lake Employment ShuttlePaths as drawn in the published feed, simplified; no base map.

Service in the current schedule

Scheduled trips and the first and last departures on a typical day of each kind in the schedule for September 7, 2026 to December 20, 2026. Both directions are counted.

DayTripsFirstLast
WeekdayFriday November 27, 2026805:5023:30
SaturdaySaturday November 28, 2026No service——
SundaySunday November 29, 2026No service——

Runs on 73 dates in this schedule, from September 8, 2026 to December 18, 2026.

Destination signs: 300 Heart Lake Bp North · 300 Heart Lake Bp South.


Where it stops

The stops of the pattern most trips follow in each direction, in order, with the stop number where the feed gives one. Some trips run shorter or different patterns; 4 different stops are served in all.

300 Heart Lake Bp North

3 stops on this pattern

  1. Trinity Common Terminal Route 32/23 WB/ 300 Stop#1933
  2. Heart Lake Rd s/of Sandalwood Pkwy#4425
  3. Heart Lake Rd s/of Ecopark Cl#4426

300 Heart Lake Bp South

3 stops on this pattern

  1. Heart Lake Rd s/of Ecopark Cl#4426
  2. Dixie Rd s/of Sandalwood Pky E#1532
  3. Trinity Common Terminal Route 32/23 WB/ 300 Stop#1933

Sources

Every factual claim above traces to one of these documents.

  1. City of Brampton (Brampton Transit)

    Brampton Transit schedule data (GTFS, open data)

    Retrieved November 27, 2026

  2. City of Brampton (Brampton Transit)

    GTFS feed (zip file)

    Retrieved November 27, 2026

  3. City of Brampton (Brampton Transit)

    Brampton Transit: routes, schedules and service changes

    Retrieved November 27, 2026

Contains information licensed under CC BY 4.0 from the City of Brampton Licence. Schedule as published; check Brampton Transit for real-time service.