Development application PRE-2024-0158, PRE-2021-0191
10100 Heart Lake Rd
10100 Heart Lake Rd is the site of 5 applications on the City of Brampton's record (pre-application consultation, official plan amendment, site plan) in Ward 2. It is at the pre-application stage: a complete application has not yet been received.
- Pre-application
- Verification of Documents; In Review-Pre Public Meeting; Site Plan Approved; Closed
- 10100 Heart Lake Rd
- 2
- PRE-2024-0158, PRE-2021-0191, OZS-2025-0043, SPA-2025-0179, PRE-2019-0007
- August 14, 2019
Proposed, in the record's words: “The proposed development consists of a mixed-use community featuring residential, commercial and recreational components, including four residential buildings (8 to 29 storeys) with 945 units, four single-storey…”. Latest dated step on the record: application received, November 18, 2025. Files PRE-2024-0158, PRE-2021-0191.
- Pre-application
- Verification of Documents; In Review-Pre Public Meeting; Site Plan Approved; Closed
- 10100 Heart Lake Rd
- 2
- PRE-2024-0158, PRE-2021-0191, OZS-2025-0043, SPA-2025-0179, PRE-2019-0007
- August 14, 2019
What is proposed
The proposed development consists of a mixed-use community featuring residential, commercial and recreational components, including four residential buildings (8 to 29 storeys) with 945 units, four single-storey commercial buildings with a GFA of approximately 11, 346 sq. m, a new public park and enhancements to the existing golf course, including a year-round golf performance and entertainment centre.
The proposal will facilitate the development of two separate high-density residential developments, the addition of two commercial buildings at the entrance to the site from Heart Lake Road, and the re-development of the golf course, which includes a proposed approximately 17,800 square metre golf and entertainment facility which includes a restaurant/bar, 88 hitting bays for a driving range, training rooms, change rooms, washrooms and associated facilities, as shown on the enclosed concept plan. The proposed southerly high-density residential site will feature approximately 945 units within four (4) buildings at heights ranging from eight to 29 storeys, with the eight-storey building being located furthest to the west of the site, the 29-storey building located at the corner of Bovaird and Heart Lake Rd., flanked by two 22-storey towers. Parking is proposed for 948 resident vehicles and 136 visitor vehicles in a proposed underground parking. Access is proposed via one right in-right out access to Bovaird Dr. W and one signalized access to be shared with the golf centre and north residential development. The proposed northerly high-density residential site will feature approximately 1296 units and a total residential gross floor area (“GFA”) of approximately 90,515 square metres within five (5) buildings aligned generally parallel to Heart Lake Road at heights of 16, 18, 21, 27 and 31 storeys, moving from north to south. Parking is provided for 1,296 resident vehicles and 259 visitor vehicles at surface and within underground parking. The proposed development includes a large amenity area between the buildings and Heart Lake Road which may include a large multi-purpose field, tennis courts, a basketball court, an outdoor gym, an off-leash dog area and pedestrian trails and seating. Vehicular access for the northerly high-density residential site is provided via a shared full-moves access to Heart Lake Road, shared with the golf centre and the southerly residential development, as well as an additional full-moves access further north on Heart Lake Road.. Two commercial buildings with a total ground floor area of approximately 900 square metres are proposed to flank the main vehicular entrance at Heart Lake Road to provide a range of commercial uses and parking for a total of 67 vehicles.
The redevelopment of the eastern and southern portions of the existing Turberry Golf Club into a mixed-use community composed of 4 mid to high-rise residential towers between 8 & 29 storeys for a total of 945 units, as well as four 4 commercial buildings with a combined commercial GFA of 11,320 m2. A public park, a public SWM pond, multi use trail, amd new public/private road network are also proposed.
The Proposed Development of the Subject Lands includes a new addition to the currently existing buildings on the Subject Lands. The new addition will consist of an indoor golf course and a simulator zone with a total area of 1,562.35 square metres. The existing clubhouse (483.86 square metres), storage garage (19.16 square metres), maintenance building (455.96 square metres) and kiosk (40.32 square metres) will all be retained and integrated with the Proposed Development, for a total combined area of 2,065.37 square metres. In addition to the proposed building addition, a new 18 hole putting course is proposed to the rear of the above-mentioned buildings. There are currently two-hundred-and-ten (210) parking spaces existing on the Subject Lands, which will remain unchanged as a part of this Proposed Development
OPA/ZBA proposal for neighbourhood commercial and high density residential with three 14 storey apartment buildings
What has happened
Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.
Application received · Pre-application consultation PRE-2019-0007
Application received · Pre-application consultation PRE-2021-0191
Application received · Pre-application consultation PRE-2024-0158
Application received · Official plan amendment OZS-2025-0043
Application received · Site plan SPA-2025-0179
The record shows nothing dated after November 18, 2025; the next recorded step appears here when the municipality enters it.
The 5 applications
The source links these records to one another (the same planning file or the same site), so they are shown as one project. Each is listed as the municipality records it.
Pre-application consultation
Pre-application consultation
Official plan amendment
Site plan
Pre-application consultation
Sources
- Planning applications (Brampton GeoHub layers) — checked November 27, 2026